Solar net metering has emerged as a pivotal initiative in Pakistan’s renewable energy landscape since its introduction in September 2015. This policy allows consumers to generate their own electricity via solar panels, and any excess energy produced can be fed back into the national grid. This mechanism not only promotes the use of clean energy but also provides financial incentives for consumers. Solar energy is becoming an attractive option for households, businesses, and industries alike. This blog post will walk you through everything you should know about solar net metering in Pakistan in 2025.
About Solar Net Metering
NEPRA issued a net metering policy in September 2015 that allows the Distribution Company of Pakistan (DISCO) to purchase surplus power generated by customers and offset it against power usage from the grid.
What is Solar Net Metering in Pakistan?
Solar net metering (green metering), a device that allows solar energy consumers to sell or send surplus solar energy to the national grid for fiscal gain. Essentially, it allows consumers to “sell” surplus energy and “buy” energy when they need it, creating a two-way energy flow. To manage this flow, a meter installed is called a bi-directional meter. If you are planning to install a solar PV system in Lahore, you need to know about net metering in Pakistan.
Criteria for Net Metering in Pakistan
Here are the key highlights of net metering regulations in Pakistan:
- Ownership: Residential, commercial, and industrial users can apply.
- System Size: Systems from 1 kW to 1 MW are eligible for net metering.
- Connection Type: A distributed generator is an on-grid or hybrid solar system owner with a 3-phase meter connection. Off-grid systems do not qualify for net metering.
- Compliance: The installation must comply with National Electric Power Regulatory Authority (NEPRA) and the Alternative Energy Development Board (AEDB) guidelines and safety standards.
How to Apply for (Green Meter) Net Metering in Pakistan 2025?
The application process for net metering in Pakistan is as follows:
1. System Installation
Before applying for net metering in Pakistan, consumers must have a solar photovoltaic (PV) system installed at their home or business. If you’re looking for solar panel installation in your home, contact Intex Solar Energy at this number: 0314-9994114.
2. Engagement with an AEDB Registered company
If you already installed a solar system, then start with this step. Engage a reputable solar installation company that is familiar with AEDB and that can manage the application process on your behalf. You may wonder why you can’t apply for net metering yourself because NEPRA does not allow individuals to apply for net metering directly.
3. Documentation & Application Preparation
After contact with reputed AEDB-registered company. The next step is documentation for the application. Key documents required for the net metering application are:
- NEPRA Application Form.
- A copy of the applicant’s National ID card.
- Recent electricity bills.
Important Note:- If any other documents specified by the company are required. The AEDB-registered company will help you and also help you forward the application to the relevant department.
4. Application Review & Technical Analysis
After submitting the application, the technical team will arrive and review. An inspection will be conducted by the local energy department to ensure compliance with regulations. This will take 3 or more working days.
5. Inspection and Issue of No Objection Certificate (NOC)
After review and technical analysis. If you qualify for inspection, a No Objection Certificate (NOC) will be issued under SRO 892 (1)/2015; otherwise, the DISCO will return the application and notify the applicant’s reason.
6. Agreement Signing
7. Generation License Issuance
The signed agreement is submitted to NEPRA for verification, leading to the issuance of a generation license. The generation license required a fee, as we mentioned below. The applicant shall deposit the charges in the selected bank and inform the DISCO office through a written notice within 20 days of receipt. This license authorizes consumers to operate as independent power producers and sell excess electricity back to the grid.
Fee Structure For Net Metering in Pakistan
Size of Distributed Generator (DG) | Fees |
0-20 KW | Free of Cost |
20-50 KW | Rs. 500/- |
50-100 KW | Rs. 1000/- |
100-1000 KW | Rs. 5000/- |
Note: The generation license fee structure mentioned above follows NEPRA regulations. It can be changed in a timely manner.
8. Net Metering Activation
Hurray! Once all approvals are in place and the generation license is obtained, net metering services are activated. DISCO will install a bi-directional meter within 30 days. This meter will keep track of both how much energy you use and how much you send back into the grid. This is very important for correct billing and crediting.
Final Words
Solar net metering in Pakistan is a transformational step toward sustainable energy solutions. By enabling consumers to generate their own electricity and contribute to the national grid, it brings economic, environmental, and social benefits. We also discuss, How to Apply for Net Metering in Pakistan? Although challenges remain, the future of net metering looks promising, especially with government support and growing public awareness.
FAQs
How much does net meter price in Pakistan?
The net meter price in Pakistan normally ranges from PKR 18,000 to PKR 120,000 and may vary depending on the provider and region.
What is the rate of net meter in Pakistan?
The net metering rates or tariff in Pakistan for selling excess solar power back to the grid are around PKR 19.32 per unit for residential, PKR 22.2 per unit for commercial, and PKR 11.3 per unit for industrial as per the net metering policy and Wapda Unit Price in Pakistan.
What is net metering in Pakistan?
Net metering in Pakistan helps consumers link solar or other renewable energy sources to the national electricity grid. It credits extra energy delivered to the grid and charges consumers when using it, balancing energy use.
Can I apply for net metering with an off-grid solar system?
No, net metering requires a system that is either an on-grid or hybrid solar system with a 3-phase meter connection.
Are there specific requirements for LESCO net metering?
You need a on grid-compatible solar system, a certified installer, and an eligible property within LESCO’s coverage area.